Project: PV Carport Integrated with Micro-grid Energy Storage System

Location: Dingli Zhuhai Headquarters Industrial Park

Rated capacity: 100kW/215kWh

The Challenges

  • High Energy Costs: Due to peak-hour grid reliance.
  • Sustainability Goals: Need to cut carbon emissions.
  • EV Charging Needs: Reliable infrastructure for growing EV demand.

Our Solution

Solar + Grid Hybrid Power System:

  • Primary Power: Solar energy supports the main load, reducing grid dependence.
  • Backup Power: Batteries charged during off-peak hours for cost efficiency and stable supply.

Surplus Energy Management:

  • Excess solar energy fed back into the grid for optimized use and savings.

Product Configuration:

  • Solar Panels: 50kWp
  • Energy Storage: 215kWh
  • PV Inverter: 50kW
  • Power Conversion System: 100kW
  • EV Chargers: 1 x 40kW DC fast charger, 8 x 7kW AC chargers

Solution Benefits

  • Enhanced EV Charging: Supports simultaneous charging of 9 EVs.
  • Annual Power Generation: 69.8MWh, reducing grid reliance.
  • Carbon Reduction: Cuts 70 tons of CO2 emissions annually.
  • Cost Savings: Off-peak charging and solar power lower overall costs.

Summary

Juding's integrated PV and energy storage system offers the Industrial Park a sustainable, cost-effective energy solution. By harnessing solar power and advanced storage technology, the company reduces energy costs and emissions while enhancing its EV charging infrastructure.